Installation of a new, deep phone communication line.

  • Home
  • /
  • Installation of a new, deep phone communication line.

Brief Overview:

The reported outcomes of the case involve directional boring-related damage during the installation of a deep underground telephone utility in Jacksonville, resulting in damage to an existing electric utility, with no reported injuries, prompting the local communications company to seek assistance from a local engineering firm for a feasible technical solution for the repair.

Full Case Study as Reported:

While installing a deep underground telephone utility (over 10 foot deep) in Jacksonville, a directional boring contractor working for Bell South damaged an existing electric utility that was also deeply buried.


Bell South contacted a local engineering firm requesting assistance in designing a repair.


After reviewing the technical details, the engineering firm informed Bell South that it was unfamiliar with a feasible technical solution for repairing the damaged line.

Outcomes Reported:

Cause: Directional boring related damage


Damage: Damage to utility


Injuries: None

Related Keywords:

Electric cables, Drill


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
  • Home
  • /
  • Installation of a new, deep phone communication line.
>